My name is Mohd Zainal Ahmad Dani, age 36 years old from Malaysia, I am a highly motivated
individual seeking a challenging position in
Telecommunication Engineering, i.e. GSM/2G/EDGE
technology, which allow me to utilize my skills
and exhiit my potential.
My educational banckground are from Shah Alam
Polytechnic and Ungku Omar Polytechnic in Perak,
Malaysia which a Diploma in Electronic
Engineering (majoring in Telecommunication)
I has equipped with vas experience in Mobile
Telecommunication Industries. Currently, I am an
Engineer in Digi Telecommunication S/B base in
Kuala Lumpur of Malaysia with working experience
more than 11 years.
WORKING HISTORY:
Radio Access Support ¡V BSS (BASE STATION
SUBSYSTEM) (Nov. 2004 ¡V Present)
ć Responsible for Network Analysis via
Radio Comander BR 7.0(RC), second level (TAC2)
Support for fault finding/trouble shooting for
BTSE type BS 240, BS 240II, BS 240XL BS 240XL
II, BS241, BS 82II eMicro.
ć Assist other network element issues i.e.
performance and quality issue arrises by Radio
Network Optimization (RNO) and Performance
Management Teams.
Field Operation - BTS Central Region (Jan. 2001 ¡V
Oct. 2004)
ć Responsible for operation and
maintenance, fault-finding and trouble-shooting
on ERICSSON RADIO BASE STATION (RBS 205, RBS
2000, RBS 2X06), SIEMENS BS 240, BS 240XL, BS
241, BS 241II,BS 82II e-micro.
ƒá Testing ¡V Stand Alone Test using UP Sim
or BSC Sim, antennae and feeder cable test by
using Site Master B321A (VSWR and DTF)
ć Responsible for O&M, trouble-shooting on
transmission PDH link i.e.ERICSSON (MINILINK E &
C), DMC (SPECTRUM II), ALCATEL (9400 series),
SKYCOM and NERA mini link Equipments.
ć Responsible for O&M, trouble-shooting on
ERICSSON DXX System (eg: Cluster node, A111
node, Basic node, Basic 6C Node and Micro Node)
ć Responsible for New Site Projects (NSP)
acceptance and test, hand over of RBS 2000
(indoor or outdoor unit) and to ensure all
process are follow the standart guideline.
ć Responsible for Siemen Swap project
supervise and acceptance.
ć Responsible for O&M, trouble-shooting on
Emerson DC Power System (-48V DC)
Transmission Planning and Design (April 1995 ¡V
Dec 2000)
ć Carry out frequency scanning by using
spectrum analyzer, digital transmission
analyzer, Frequency Planning, prepare Link
budget by using microwave link software
(Pathloss software) as well as complete the new
link Technical Reports for PDH and SDH network.
ć Carry out site survey for transmission
infrastructure and facilities for microwave and
cable plan project (brown field and green field)
and prepare a survey reports.
ć Prepare station/site
engineering/technical specifications,
concept/designs and drawing.
ć Prepare Technical Report for trunk
microwave link projects, POI microwave link
projects.
ć Prepare Technical Reports for
transmission infrastructure and facilities for
new trunk site development (eg. : Cabin
Specification, Site orientation etc)
ƒá Prepare BQ¡¦s (Bill of Quantities) and
IWO (Instruction Work Order) for transmission
infrastructure project.
ć To coordinate with implementation team
on the progress/status of the transmission
infrastructure and facilities projects during
implementation construction work or review it¡¦s
if necessary.
No trackbacks.