"QA/QC civil Inspector/Surveyor"
PAULO BERNAL, NUNAGAddress in Phils.: # 88 Green Village Concepcion, Tarlac, Philippines In Abroad : ABDULLAH AL SHAIKH Est. P.O. Box 20706 al- khobar 31952 K.S.A. E-mail: paul_nunag@yahoo.com Cell no. +63921-6307358 ( Phil. ) Cell no. +63915-6542815 ( Phil. ) Cell no. +966507901354 ( Jubail K.S.A ) Bravo. No. +966515047379 Position Applied: Civil QA / QC Availability: Synopsis More than thirteen(13) years of excellent exposure on various engineering construction and inspections discipline as well as Building Construction, Road Construction, Refinery, Desalination, Petrochemical, Power Plant, Pipeline and Oil & Gas Industry, erection of structural steel, laying underground /aboveground mechanical piping, plumbing-sanitary, painting & architectural-finishing, operation & maintenance works including Health, Safety & Environment aspects. EDUCATIONAL ATTAINMENT: College : UNIVERSITY OF THE ASSUMPTION 1987-1992 Address : San Fernando City Pampanga, Philippines Degree : Batchelor of Science in Civil Engineer WORKING EXPERIENCE: Company : ABDULLAH AL-SHAIKH EST. Jubail Industrial City K.S.A. Project : AAC – ETHYLENE AMINES PROJECT Position : Site Engineer ( Civil ) Period : March 5, 2009 - Present Duties and Responsibilities: 1. In – charge in technical supervision on Concrete Structure such as concrete, reinforcement and other items related to Building Constructions. 2. Coordination and monitoring of all works on my designate area. 3. Complied for the execution of works under the approved plans and specification 4. Monitoring, surveillance and pushing the works of site to meet the project schedule. 5. Estimation of rebar, formworks, embedded items on every specific work area 6. Monitoring of all the materials delivered per approved submittal of the client on area of work prior to install. 7. Prepare weekly and monthly report accomplishment works. Company : GAMA INDUSTRY ARABIA LTD. Ras az Zawr, Saudi Arabia Project : MA’ADEN PHOSPHATE PROJECT SULPHURIC ACID PLANT Position : Civil QA / QC ; Civil Supervisor Period : February 3, 2008 to Jan.2, 2009 Duties and Responsibilities: 1. In-charge in technical supervision on site such as rebar works, for vertical and horizontal structure. 2. Coordination and monitoring of all works on my designate area. 3. Complied for the execution of works under the approved plans and specification. 4. Prepare (RFI) for the inspection of works and immediately response to all deficiency finding by Quality personnel to meet the project requirement and project schedule. 5. Prepared everyday schedule of works and three (3) weeks look-ahead schedule Plan. 6. Prepared materials take-off/Quantity take-off on the required project schedule. 7. Monitoring, surveillance and pushing the works of site to meet the project schedule. 8. Inspection of rebar, formworks, embedded items on every specific work area prior for final inspection of the client. 9. Inspection of all the materials delivered per approved submittal of the client on area of work prior to install. Company : GAMA INDUSTRY ARABIA LTD. Yanbu, Kingdom of Saudi Arabia Project : NATPET OSBL PROJECT Position : Chief Suveyor /Civil Supervisor Period : February 28, 2006 to December 09, 2007 Duties and Responsibilities: 1. In-charge in technical supervision, coordination and monitoring of works. 2. Ensures that all execution of works shall comply with the approved Plans and Specification. 3. Responsible in the Supervision and Documentation for the project, Supervision and responsible on installation reinforcement bars and formworks base on the plans; Responsible also on placement of massive concrete activities. 4. Implemented survey Alignment checking of steel structure per survey checklist required. Measuring and checking of position of embedded plate for the structure as maintained the quality of works. 5. Prepare weekly and monthly report accomplishment works to Construction manager as project progress. 6. Coordinate day-by-day to the Construction Manger & QA/QC Manager, before executing the work for some revise drawing and daily meeting. 7. Rectified all deficiencies of the punch list item prior for final hand-over and commissioning. Company : ALI H.AL-GHAMDI EST. Rahima, Rastanura, K.S.A. Position : Civil Supervisor and Surveyor Period : November 1997 to December 2005 Projects : Rehabilitation of Potable, Irrigation and Sanitary line at Tareeg 101 ( Jubail ) : Aramco Refinery and Marine Port ( Jeddah ) ( Maintenance Works ) : Royal Commission Project ( Rehabilitation of waste water Valve chamber at jubail area ) : Aramco Project in Jubail (Berri Gas Plant, khursania, Abuhadriya and Fadly.) : Kemya Olefins Project ( Jubail area ) : Aramco Jeddah Refinery ( Pipe Re-routing Projects ) : Aramco Musadia Jeddah Administrative office ( Fire water line Projects ) : SCECO Power Plant (PP# 7) at Riyadh ( Steel Structure Projects ) : Gulf Steel Factory Projects at Jubail ( Steel and Building Strutures ) : Naval Base in jubail (Replacement of potable line Valves and undergrounds units) : Marafiq Power Plant at Yanbu ( RTR Pipeline projects ) : King Fahd Sea port Yanbu area ( Fire water line Projects ) Duties and Responsibilities: 1. In-charge in the technical supervision, site coordination and monitoring of work activities. 2. Construction & maintenance of drainage & manholes system. 3. Restoration of the side walk incl. inlets, curbs and gutters. 4. Prepared monthly quantity take-off of materials need on the site. 5. Inspection of finished works for daily accomplishment reports. 6. Reporting all progress by daily, weekly and monthly to the construction manager. Company : ASIA VERTIC CONSTRUCTION INC. Balik – Balik St. New Manila Quezon City Philippens Position : Field Engineer and Estimator Period : November 1993 to August1996 Projects : Henley Resources Corporation (HRC) Two (2) Storey Commercial Bldg. Wilson St. San Juan, Metro Manila, Philippines 6 Months of finishing works : Jorge Bocobo Project (JBP) 5 Storey Commercial Bldg. J. Bocobo St. Malate, Metro Manila, Philippines 11 months of roughing-in and finishing works : Danilo Victoria Project (DVP) 7 Storey Office / Commercial Bldg. Rizal Ave. Sta. Cruz Manila 5 months of finishing works : Saint Patrick Commercial (SPC) 5 Storey Bldg. with Basement and Penthouse A. Arnaiz Ave. Corner J. Victor St. Makati City 4 months of finishing works Duties and Responsibilities: 1. Reporting to the Project Manager In-charge in the coordination of the Project Architects / Designer, regarding the approval of all construction plan. and specification, Shop Drawing and As-built plans for the project. 2. In-charge in the technical supervision, site coordination and monitoring of sub-contractors activities such as plumbing, electrical, paintings and other finishing works. 3. Ensure that all accomplishment works shall comply with the approval plans, Methodology and Materials. 4. Responsible in the Supervision and Documentation for the project Supervision and responsible on installation reinforcement bars and formworks base on the plans; Responsible also on placement of massive concrete activities on vertical construction. 5. Prepare daily, weekly and monthly accomplishment report. 6. Coordinate from time to time to the field operation manager and project inspector and implemented given instructions. 7. Estimate the materials needed to the project. Company : Big King Enterprises Position : Site Engineer Period : December 1992 to May 1993 Duties and Responsibility: 1. In-charge in the technical supervision, site coordination in all my respective areas. 2. Estimate of Materials needed on the site. 3. Prepare daily, weekly and monthly progress report. 4. Prepare daily time record of Manpower on the site. REFERENCES: 1. Mr. Richard Chang Big King Enterprises General Manager 2. Mr. Edward Pelayo Asia Vertic. Contruction Inc. Field Oprt’n. Manager 3. Mr. Mohd. Boban Ali H. Al- Ghamdi Est. Area Manager *** All certification will be provided as per request. Paulo Bernal Nunag Applicant |